Jabiru Owners Group

Welcome to the world of Jabiru

Centre Tunnel Hole

General advice on building your kit aircraft.
  • Advertisement

Centre Tunnel Hole

Postby Admin » Wed Feb 11, 2015 1:49 pm

Originally posted by Vic Leggott

Enlarge the slot in the fibreglass center tunnel where the elevator control rod passes through and attaches to the control column. Check clearance in the full up and down in both full left and right stick positions. Sufficient clearance is required to prevent side-bending loads on the end of the control cable.

tunnelhole.jpg
Tunnel Hole
tunnelhole.jpg (10.23 KiB) Viewed 1377 times
Jabiru UL-450 built 2000 S/N 589
CAMit Alternator
Panel Throttles
MGL Explorer EFIS
Trig TT21 Mode S Transponder
Funkwerk ATR833 8.33khz Radio
Flight Data Systems GD-40 CO Monitoring
PowerFlarm Collision Avoidance
PS Engineering PM3000 Intercom
Admin
Site Admin
Site Admin
 
Posts: 124
Images: 98
Joined: Tue Feb 03, 2015 11:00 pm
Aircraft: Jabiru UL-450

Return to General

Who is online

Users browsing this forum: No registered users and 0 guests